We decided to somewhat remodel the upstairs bathroom.
We are:
- Painting
- Redoing some of the plumbing
- Moving the sink where the toilet is
- Moving the toilet where the sink is
- Replacing the tile
Here are some BEFORE, DURING and AFTER pictures:
[read the captions below the pictures]
BEFORE:
DURING:
The sink and toilet are hanging out in the tub. The tile has been torn out.
Where the sink used to be.
Above where the toilet was.
Where the mirror was.
Toilet
Gross floor
Behind the door
The door is to the right.
Where the old vent was.
New Toilet hole
Old toilet hole. You can see the laundry room from up there... lol
Painting.


New tile. Rich laid the tile and then I did the grout.

New tile!!!
The sink and toilet are still hanging out in the tub!
AFTER:
The toilet and sink are in!
Woot woo!

The blue looks sooo much better.



Needless to say, we wont be taking on a project like this for a while. Even though the end result was awesome! Our weekend job turned into almost a whole week!!

1 comment:
It looks awesome!
Jobs like that always ending up taking WAY more time than you plan!
Post a Comment